The main road connects to the new ring road in Rumford, the upper road that goes under the rail connects to where the current interchange is in the released version!
Similarly, the bottom section of road then connects to the new P&R site and then goes on to connect with Glenton, Landbury and Keedlestone (from the original 1.5 reloaded version of the map), including a future connection to Corton Bay (from 1.5)
The new Interchange features 4 platforms (which hopefully will include AI trains), as well as 4 loading stands and a single unload only stand. There are 4 layover bays to be used after unloading, to wait time and these will also be used by AI.
A final image will be posted upon completion!
Any questions or requests, feel free to post below!
Leave a Reply